Sample site / Truechord portfolio project – this business is made up.

Page 06 · Kitchens

A kitchen for crooked walls

In a rubble-stone house from 1820, no wall is straight. So we scribed every panel to the stone – instead of forcing the wall to fit the kitchen.

Section
Kitchens
Place
Fischbach
Year
2025
Build time
14 weeks
Wood
Oak, Birch & plywood

Starting point

The brief

The Rauch family had spent three years renovating the old house in Fischbach themselves. The stone wall in the kitchen was to stay exposed – no plaster, no false wall. An off-the-shelf kitchen would have left gaps of up to four centimetres along it.

They wanted a calm oak kitchen with lots of storage, a tall larder unit and drawers instead of doors in the base units. The worktop had to be wood that can be re-oiled and even sanded down over the years.

So the real job wasn’t the kitchen – it was the joint between 200-year-old stone and new wood.

A straight wall forgives nothing. A crooked one forces you to look closely.

— Katrin Thielen

Wood and finish

Materials

Also used

  • Hard-wax oil, two coats
  • Soft-close drawer runners
  • Fireclay sink (the client’s own)

Sizes & facts

Run length
5.60 m
Tall unit
60 × 62 × 228 cm
Drawers
11
Largest wall deviation
38 mm

How we went about it

Process

  1. Survey with laser and plumb line

    We measured the wall every ten centimetres and traced its profile at full size onto paper.

  2. Choosing boards

    For fronts with continuous grain we picked three oak planks from one log and cut the fronts in sequence.

  3. Carcasses and drawers

    Carcasses in birch plywood, drawer boxes properly dovetailed – half-blind at the front, through at the back.

  4. Scribing to the stone

    On site, every filler was scribed to the stone with dividers, cut in the workshop and fitted by hand.

  5. Fitting and oiling

    Fitted in three days, then a second coat of oil on the worktop on site.

14 weeks

Timeline

  1. Design & quote3 wk
  2. Wood & cutting2 wk
  3. Workshop6 wk
  4. Scribing on site2 wk
  5. Fitting & oil2 wk

4 drawings

Picture story

Tap to enlarge. Swipe or use the arrow keys in the viewer.

Planning something similar?

Tell us about your room. The form is already filled in for this kind of project.

Enquire about this

Thielen · No. 56 · Autumn 2026Page 06

CallEnquire